Yes — we deliver across the UAE with our own and hired transport. Duct bundles are strapped, tagged with drawing numbers and can be sequenced by zone and floor to match your installation programme.
Incoming coil and panel material is checked against mill certificates, dimensional checks are taken at the CNC and flanging stations, joints are leak-checked, and every dispatch is inspected against the approved shop drawings before release.
Our fabrication plant is in Jebel Ali Industrial Area 1, Dubai, with a production floor of 1,000 sq. mtr. We serve contractors and MEP companies across Dubai, Abu Dhabi, Sharjah and the wider GCC.
Standard product enquiries are quoted the same working day. Full BOQ or drawing-based quotations are returned within 24 business hours with an itemised breakdown of material, gauge, fittings and lead time.
Stocked accessories can be collected the same day. Standard GI duct is 5–7 working days, pre-insulated and air distribution products 4–9 days, fire-rated and kitchen exhaust packages 10–15 days after drawing approval.
A BOQ, duct schedule, or IFC/shop drawings in DWG or PDF. Include the project location, required completion date, insulation and finish requirements, and whether Civil Defence documentation is needed.
Yes. Mill certificates for coil, plate and stainless, fire test certificates for rated systems, and coating data sheets are compiled into a project documentation pack for consultant and Civil Defence submission.
The Jebel Ali setup runs automated coil lines, CNC plasma cutting, TDF flange forming and dedicated fabrication bays, allowing us to deliver typical commercial projects within 5–15 working days of drawing approval.
Light testing is standard on fabricated sections. Full pressure (ATC) leakage testing to DW/144 Class A/B/C can be arranged for systems that specify it.
SMACNA HVAC Duct Construction Standards, DW/144 for sheet metal ductwork, EN 12237 for circular duct, EN 1751 for dampers, BS 476 and EN 1366 for fire resistance, and NFPA 90A / 92 / 96 where the fire strategy calls for it.
Yes. We review the specification, flag any conflict between gauge, pressure class and reinforcement, and offer compliant alternatives where they save cost or time.
Most of our work is supply-only fabrication and delivery to site. On request we can arrange installation through trusted partner teams for kitchen exhaust and specialist fire-rated packages.
Send it with your drawing or specification and an engineer will answer directly.